When we started working on the porch at the Lake House it was not in very good shape. There were problems with supports, issues will bad wood, and a serious need of repainting. After a lot of hours of work we have the porch rebuilt. We removed the ramp. Some of the supports under the porch needed replacement. All of the porch needed sanding. Some boards were warped and we replaced those. Then we stained the wood. All the railings were removed and replaced in a pattern that was used at Shawna's mothers home. Last we painted the area around the porch. We will paint the rest of the house this month. We will be working inside Friday through Monday. The highs will be 100 degrees to 103 degrees through Tuesday. For the rest of the summer highs over 100 are common.